Status: Completed

Springfield University Hospital

Infrastructure Services at SWLSG Springfield Hospital Development inclusive of the following services: Site Wide Natural Gas Underground Ser
Virtus Data Centre

Virtus Data Centre

This scope of works consists of 3no Data Halls supported by the following: 2no HV supplies 2no HV SWBD 6no HV/LV RMU/Transformers 6no HV Gen

Baltimore Wharf Phase 2

Phase 3 of the Baltimore development comprised of Building 1, a 45-storey residential tower and Building 9 comprised of 17 storey residentia
Building 8 - Baltimore Wharf

Building 8 – Baltimore Wharf

The residential development consists of one 20 story block of 706 Apartments for student accommodation. Ampsail were appointed to undertake
Lollard Street

Lollard Street

Comprising of residential dwellings, both apartments and housing together with public areas and Nursey. Ampsail were appointed to deliver a
The Pumphouse

The Pumphouse

Comprising of 24 story tower block which was made up of 161  residential units and 5 commercial units an Energy centre, substation and under
The Grove Eltham

The Grove Eltham

144 No apartments and communal areas, comprising both of 102 private dwellings and 12-part ownership dwellings and 30 housing association dw
The Oaks Shopping Centre

The Oaks Shopping Centre

174 apartments spanning over 6 blocks highest of which is 8 floors and 14 No retail units within the lower ground floor shopping centre. The
University of Reading

University Of Reading

Ampsail were required to convert 17 buildings, each from existing steam to newhigh efficiency LTHW heating source. During all works the syst