Portal West
Supply & Install subcontract to provide new Mechanical & Electrical Shell & Core Services and Installations for the construction

NoCo Hotel – Building B3
The Fit Out Project for NoCo at Building B3 includes fitting out works to basements, ground floor, ground floor mezzanine, level 1 plant roo

Springfield University Hospital
Infrastructure Services at SWLSG Springfield Hospital Development inclusive of the following services: Site Wide Natural Gas Underground Ser

Citigen – Farringdon West (E.ON)
Upgrade of CHP central energy centre near Smithfield and a11 km district energy network in the northwest part of the City supplying public a

Virtus Data Centre
This scope of works consists of 3no Data Halls supported by the following: 2no HV supplies 2no HV SWBD 6no HV/LV RMU/Transformers 6no HV Gen

Wood Wharf H1, H2, H3 & H4
This scope of works covers the entire Shell and Core and Residential Fit-out of the entire Mechanical, Electrical and Public Health services

The Pumphouse
Comprising of 24 story tower block which was made up of 161 residential units and 5 commercial units an Energy centre, substation and under

The Grove Eltham
144 No apartments and communal areas, comprising both of 102 private dwellings and 12-part ownership dwellings and 30 housing association dw

The Oaks Shopping Centre
174 apartments spanning over 6 blocks highest of which is 8 floors and 14 No retail units within the lower ground floor shopping centre. The

University Of Reading
Ampsail were required to convert 17 buildings, each from existing steam to newhigh efficiency LTHW heating source. During all works the syst